Visual Maps¶
Five interactive diagrams — different ways of seeing the same landscape.
Click any map to open it full screen. Use your browser to scroll, zoom, and explore. Hit the back button (or the ← Back to Maps link at the top of the map) to return here.
Ecosystem Map
Best for: What IS the Writing Studio in relation to everything else ProActive does? Where are the structural gaps?
Open Full Map ↗Content Lifecycle Workflow
Best for: How does a piece move from idea to publication? Where is time currently spent vs. where should it be?
Open Full Map ↗Hub & Spoke Interface Map
Best for: Which systems connect to the Studio? Which connections are active, partial, or missing entirely?
Open Full Map ↗Actor Activity Map
Best for: Who does what at each stage? Where are the handoff gaps between Richard, AI agents, and systems?
Open Full Map ↗Artifact Flow Map
Best for: How do artifacts (drafts, WSDs, patterns) move through the system? What is created, consumed, and transformed at each stage?
Open Full Map ↗Cascade System Architecture
Best for: How does performance data feed back into strategy? What are the four cascade levels, five feedback loops, and fifteen artifacts that connect publication to learning?
Open Full Map ↗What the Maps Tell Us¶
Taken together, the six maps point to the same diagnosis:
The Writing Studio is step 4 of 11 in the content value chain.
ProActive has strong capability in production (Steps 4–6) and weak or missing capability in strategy (Steps 1–3), distribution (Step 7), measurement (Step 8), and learning (Steps 9–11). The Studio produces content; the surrounding system for making that content compound and convert is not yet built.
Map 6 (Cascade System Architecture) shows the infrastructure now added for Steps 8–11: fifteen artifacts spanning four levels, connected by five named feedback loops that return performance data to content decisions.
The five most critical gaps from the original audit, in priority order:
- CRM / stakeholder intelligence — partially addressed (Referral Network artifact added)
- Analytics — partially addressed (Performance Records + EQS tracking infrastructure added)
- Content CMS — no stable publication infrastructure on proactiveresolutions.com
- Audience Intelligence — addressed (6 audience persona files created)
- Repurposing Engine — partially addressed (Distribution Brief pre-production requirement established)
Gaps 3 and 5 (CMS, automated repurposing pipeline) remain for Phase 2 buildout (May–July 2026).